Showing 7 to 12 of 35 Case Studies

Artificial grass installation at Lost City Adventure Golf using F. Ball's Styccobond F3 flooring adhesive.

Lost City Adventure Golf

Husband and wife team Anthony and Lizzie Holmewood installed artificial grass carpet on and around obstacles of the courses at Lost City Adventure Golf, as part of the refurbishment of what is one of Europe’s...
F. Ball's Styccobond F3 adhesive being used to install flooring in Tobins Boxing Gym.

Tobins Gym, Leeds

Products from F. Ball and Co. Ltd., including Styccobond F3 and Styccobond F44 adhesives, have delivered a robust flooring installation that will stand up to the rigours of a Thai boxing gym in Leeds. Flooring...
Flooring installation using F. Ball products in a brand new Bromsgrove bar.

Bromsgrove Bar

Products from F. Ball’s System LVT range, including Stopgap 700 and Stopgap 1200 smoothing compounds and Styccobond F46 pressure sensitive adhesive, were chosen to meet high expectations for a contemporary...
F. Ball's Stopgap 1400 used in a flooring installation project at Carew Academy.

Carew Academy

F. Ball and Co. Ltd.’s high flow, two-component smoothing compound, Stopgap 1400, has delivered a copybook finish in a flooring installation at the newly constructed Carew Academy for children with special...
F. Ball's Stopgap 1400 smoothing compound being used in a flooring installation in Schoolblazer HQ, Mansfield.

Schoolblazer, Mansfield

F. Ball’s fast-setting, high flow, two-component smoothing compound, Stopgap 1400, has been used to prepare subfloors to optimise the installation of floorcoverings at Schoolblazer HQ, the headquarters...

Follow F. Ball