Showing 1 to 6 of 6 Case Studies

F. Ball's Stopgap 1400 used in a flooring installation project at Carew Academy.

Carew Academy

F. Ball and Co. Ltd.’s high flow, two-component smoothing compound, Stopgap 1400, has delivered a copybook finish in a flooring installation at the newly constructed Carew Academy for children with special...
F. Ball's Stopgap 1400 smoothing compound being used in a flooring installation in Schoolblazer HQ, Mansfield.

Schoolblazer, Mansfield

F. Ball’s fast-setting, high flow, two-component smoothing compound, Stopgap 1400, has been used to prepare subfloors to optimise the installation of floorcoverings at Schoolblazer HQ, the headquarters...
F. Ball's Styccobond F44 adhesive used to install flooring at Glenwood High School.

Glenwood High School

Stopgap 300 heavy-duty smoothing compound and Stopgap Micro Rapid floor finishing compound, have been used to meet exacting subfloor preparation standards required ahead of the flooring installation of...
Finished Flooring Installation in Aberystwyth University Arts Centre.

Aberystwyth University

Technical representatives from F. Ball and Co. Ltd. have provided flooring contractors, with a cost-effective alternative to completely removing and replacing a weakened screed as part of a flooring refurbishment...