Projects
- Projects
Case Study: Schoolblazer
October 2024
F. Ball’s new high flow, two-component smoothing compound, Stopgap 1400, has been used to prepare subfloors to optimise the installation of flooring at the headquarters of the UK’s leading school...
- Projects
Case study: Silver Endeavour
October 2024
Delivering ‘the perfect flooring installation’ for luxury Crystal cruise ship, the Silver Endeavour, has been achieved by flooring contractor Venue Marine, installation partners of specialist IMO products...
- Projects
Case Study: Nottingham Central Library
June 2024
F. Ball products, including dual-purpose Stopgap Fill and Prime thixotropic primer and Stopgap 1200 smoothing compound, have been used to create a large-scale, high-performance flooring finish in the new...
- Projects
Case Study: Glenwood High School
June 2024
Stopgap 300 heavy-duty smoothing compound and Stopgap Micro Rapid floor finishing compound, have been used to meet exacting subfloor preparation standards required ahead of the flooring installation of...
- Projects
Project of the Month: Somerset House
September 2023
Stopgap Micro Rapid has delivered a fast-track solution for refurbishing the iconic Nelson Staircase at Somerset House, London.
As part of ongoing maintenance and improvement works, flooring contractor...
- Projects
F. Ball Products Continue to Deliver in £40m Hotel Refurb
September 2023
F. Ball adhesives and subfloor preparation products have led the way in the Heythrop Park Hotel refurbishment, in Oxfordshire, following its acquisition by Warner Leisure Hotels.
Contractors from Carter’s...
Showing 7 to 12 of 13 Posts