Projects

  • Projects
Flooring installation using F. Ball smoothing compounds and adhesives at Schoolblazer HQ in Mansfield.

Case Study: Schoolblazer

October 2024

F. Ball’s new high flow, two-component smoothing compound, Stopgap 1400, has been used to prepare subfloors to optimise the installation of flooring at the headquarters of the UK’s leading school...
  • Projects
Flooring installation on the Crystal Endeavour cruise ship using F. Ball products.

Case study: Silver Endeavour

October 2024

Delivering ‘the perfect flooring installation’ for luxury Crystal cruise ship, the Silver Endeavour, has been achieved by flooring contractor Venue Marine, installation partners of specialist IMO products...
  • Projects
Flooring refurbishment using F. Ball products at Nottingham Central Library.

Case Study: Nottingham Central Library

June 2024

F. Ball products, including dual-purpose Stopgap Fill and Prime thixotropic primer and Stopgap 1200 smoothing compound, have been used to create a large-scale, high-performance flooring finish in the new...
  • Projects
F. Ball's Styccobond F44 flooring adhesive being used to install Harlequin Floors sprung dance floor at Glenwood High School in Sydney, Australia.

Case Study: Glenwood High School

June 2024

Stopgap 300 heavy-duty smoothing compound and Stopgap Micro Rapid floor finishing compound, have been used to meet exacting subfloor preparation standards required ahead of the flooring installation of...
  • Projects
Flooring refurbishment at Somerset House.

Project of the Month: Somerset House

September 2023

Stopgap Micro Rapid has delivered a fast-track solution for refurbishing the iconic Nelson Staircase at Somerset House, London. As part of ongoing maintenance and improvement works, flooring contractor...

Showing 7 to 12 of 13 Posts