Projects
- Projects
Project of the Month: Lost City Adventure Golf
June 2025
Styccobond F3 has been used to create smooth and seamless surfaces throughout two indoor 18-hole crazy golf courses at Nottingham’s Lost City Adventure Golf, involving painstaking care and attention...
- Projects
Case Study: Dutch Dental Practice
June 2025
Floor preparation products and adhesives from F. Ball have delivered a super smooth, hardwearing and attractive flooring finish for a dental practice in Rijssen, The Netherlands.
The flooring work was...
- Projects
Case Study: Rabobank, the Netherlands
February 2025
Flooring contractors from Rocco de Vries Woning en Projectstoffering in the Netherlands have used F. Ball products, including Stopgap 300 and Styccobond F44, to create a durable floor finish as part of...
- Projects
Case study: Tobin’s Gym
February 2025
Styccobond F3 and Styccobond F44 adhesives have delivered a robust flooring installation that will stand up to the rigours of a Thai boxing gym in Leeds, UK.
Contractors from Crown Carpets and Flooring,...
- Projects
Case Study: Schoolblazer
October 2024
F. Ball’s new high flow, two-component smoothing compound, Stopgap 1400, has been used to prepare subfloors to optimise the installation of flooring at the headquarters of the UK’s leading school...
- Projects
Case study: Silver Endeavour
October 2024
Delivering ‘the perfect flooring installation’ for luxury Crystal cruise ship, the Silver Endeavour, has been achieved by flooring contractor Venue Marine, installation partners of specialist IMO products...
Showing 7 to 12 of 17 Posts