Projects
- Projects
Case Study: Nottingham Central Library
June 2024
F. Ball products, including dual-purpose Stopgap Fill and Prime thixotropic primer and Stopgap 1200 smoothing compound, have been used to create a large-scale, high-performance flooring finish in the new...
- Projects
Case Study: Glenwood High School
June 2024
Stopgap 300 heavy-duty smoothing compound and Stopgap Micro Rapid floor finishing compound, have been used to meet exacting subfloor preparation standards required ahead of the flooring installation of...
- Projects
Project of the Month: Somerset House
September 2023
Stopgap Micro Rapid has delivered a fast-track solution for refurbishing the iconic Nelson Staircase at Somerset House, London.
As part of ongoing maintenance and improvement works, flooring contractor...
- Projects
F. Ball Products Continue to Deliver in £40m Hotel Refurb
September 2023
F. Ball adhesives and subfloor preparation products have led the way in the Heythrop Park Hotel refurbishment, in Oxfordshire, following its acquisition by Warner Leisure Hotels.
Contractors from Carter’s...
- Projects
Project of the Month: Glenwood High
November 2023
Stopgap 300 and Stopgap Micro Rapid have been used to meet exacting subfloor preparation standards required ahead of a dance flooring installation.
Contractors from Sydney-based Symmetry Flooring prepared...
Showing 13 to 17 of 17 Posts