Case study: Photo Finish for Royal Ascot Restaurant
November 2025
F. Ball’s Stopgap 1200 and dual-bond adhesive system have been used by flooring contractors from Harris & Hiscock Ltd. to install luxury Wilton carpet as part of the refurbishment of the On 5...
- Projects
Case study: Tallaght Sports Complex
November 2025
Technical advice and products from F. Ball have helped to overcome subfloor preparation challenges and provide a surface that will stand up to years of expected wear in a sports complex in Tallaght, Dublin.
After...
- Projects
Project of the Month: Lost City Adventure Golf
June 2025
Styccobond F3 has been used to create smooth and seamless surfaces throughout two indoor 18-hole crazy golf courses at Nottingham’s Lost City Adventure Golf, involving painstaking care and attention...
- Projects
Case Study: Dutch Dental Practice
June 2025
Floor preparation products and adhesives from F. Ball have delivered a super smooth, hardwearing and attractive flooring finish for a dental practice in Rijssen, The Netherlands.
The flooring work was...
- Projects
Case Study: Rabobank, the Netherlands
February 2025
Flooring contractors from Rocco de Vries Woning en Projectstoffering in the Netherlands have used F. Ball products, including Stopgap 300 and Styccobond F44, to create a durable floor finish as part of...
- Projects
Case study: Tobin’s Gym
February 2025
Styccobond F3 and Styccobond F44 adhesives have delivered a robust flooring installation that will stand up to the rigours of a Thai boxing gym in Leeds, UK.
Contractors from Crown Carpets and Flooring,...
Showing 1 to 6 of 13 Posts